The boundary fences out here were built in 1898. Or to be more precise, the wire you lean on today was strung out in 1898. The steel posts replaced the wooden posts which are still lying where they were pulled out of the ground more than 110 years ago. We stood in awe of the steel and wire for it stretches as far as the eye can see in a perfectly straight line. More than 110 years old and still straight as a die.
We take some of the original posts, still strung through with original wire and sue them to dam up the trough burrowed under the bottom wire by the goats. The rabbit wire mesh is rehitched, and clipped and in some cases it is replaced or patched. We start this work as early as possible but it is not early enough. The morning is cool and fresh but he oven door opens about 9 am and by 11 we are done. Working with no hat and with minimum water intake catches out some of the team on the first day, a lesson quickly learned. We coach everyone to keep an eye on the colour of their urine as a guide to how hydrated or otherwise they are. It is a novel concept for some of them, but that is what this time away is all about after all.
We get one of the lads hydrated, get him loaded up into the ute and start back to the quarters. It is 17km from the back fence to home – as the crow flies. A bit further as the lizard wanders.